Software Applications Overview

Loading...
View Syllabus

Skills You'll Learn

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Reviews

4.8 (779 ratings)
  • 5 stars
    618 ratings
  • 4 stars
    146 ratings
  • 3 stars
    10 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

From the lesson
Technology Applications for Scheduling
Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

Taught By

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore our Catalog

Join for free and get personalized recommendations, updates and offers.